Owner: Massachusetts Port Authority
Partner: SPS New England
Location: Boston, Massachusetts
Project Overview:
- Drove (36) 30” OD x 1” thick pipe piles, mainly from a barge, to construct the bridge foundations spanning the Reserved Channel.
- Installed (18) 20” diameter pipe piles for the new bridge abutments on each side of the Reserved Channel.
- Constructed various excavation support structures for the project.