Conley Freight Terminal

Owner: Massachusetts Port Authority Partner: SPS New England Location: Boston, Massachusetts Project Overview: Drove (36) 30” OD x 1” thick pipe piles, mainly from a barge, to construct the bridge foundations spanning the Reserved Channel. Installed (18) 20” diameter pipe piles for the new bridge abutments on each side of the Reserved Channel. Constructed various excavation support structures…